Construction zones use their own set of signs. Construction signs are any sign with black text on orange. The only exception is the End Road Construction Sign, which is red & black text on a white diamond. Construction signs may also have a supplement plaque posted below them. Below are the special signs only found in construction zones.
SIGN |
NAME | MEANING | OPTIONAL SUPPLEMENTS |
|
![]() |
Road Construction Ahead | This signs warns that a construction zone is about to begin. | Distance Ahead | |
![]() |
Road
Construction Zone |
Construction zone begins. Max 100 Min 60 Rec 90 | ||
![]() |
End Road Construction |
Construction zone ends. Return to standard rules. | ||
![]() |
One Lane Swerves |
One
lane of traffic must swerve. This sign is usually posted within sight of the event. |
||
![]() |
Two Lanes Swerve |
Two
lanes of traffic must swerve. This sign is usually posted within sight of the event. |
||
![]() |
Three Lanes Swerve |
Three
lanes of traffic must swerve. This sign is usually posted within sight of the event. |
||
![]() |
Left Lane Closed |
The far left lane is closed for construction. Merge right. | Distance Ahead | |
![]() |
Right Lane Closed |
The far right lane is closed for construction. Merge left. | Distance Ahead | |
![]() |
Multiple Lanes Closed |
The number of lanes closed is listed on top. The arrow points in the direction to merge. | Distance Ahead | |
![]() |
Flagman Ahead |
Flagman
is at least 100m ahead. Slow down and be prepared to Stop. |
Distance Ahead | |
![]() |
Uneven Pavement |
The pavement depth varies from lane to lane. | Duration | |
![]() |
Soft Shoulder |
The shoulder is not paved or is made of gravel. | Duration | |
|
Detour Directional |
Follow this sign to bypass an event. A duration plaque may display the remaining length of the detour. | Duration |